WAA is a state-of-the-art vehicle assembly facility strategically located in Kuliyapitiya, Sri Lanka. As a Board of Investment (BOI) approved venture, WAA specializes in the assembly of Semi-Knocked Down (SKD) vehicles including petrol, diesel, hybrid electric (HEV), and plug-in hybrid electric vehicles (PHEV) with engine capacities up to 3000cc.
Our 56,000 sq.m purpose-built plant is engineered to meet international OEM standards and equipped with advanced assembly lines, EOL testing, water and paint booths, specialized test tracks, and a logistics-ready infrastructure. Designed in collaboration with global production specialists, our facility is capable of producing over 9,500 units annually across two shift-ready lines.
WAA is committed to delivering precision assembly, strict quality assurance, and scalable production tailored to the evolving needs of global automotive manufacturers. With a strong focus on sustainability, we have provisions for full solar energy integration and a structured roadmap to increase local value addition in line with national industrial policies.
As Sri Lanka’s newest premium SKD vehicle assembly hub, WAA offers global brands a competitive edge in accessing South Asia’s growing automobile market with eciency, reliability, and compliance.
56000 sq.m, accommodates 2 mezzanine levels which will be used for seat manufacturing, offices and assembly line training facilities.
Pre-fabricated steel building, 14m height at the center ridge and 11m at the corners.
Ridge Ventilator.
Special floor to resist the vehicle movements with 180mm thickness, with 50kN/ sq.m.
German origin (LODIGE), which can move vehicles up to 4,600 KGs will serving all production lines have been designated.
Mahanugalanda Estate, Kuliyapitiya, Kurunegala.
“More than a vehicle assembly plant a symbol of innovation, engineering excellence.”
POWERED BY SENOK